PROJECT DESCRIPTION
Structures concreting works of the reconstruction of VEF production blocks (1st stage) at 214i Brīvības iela, Rīga
Main volumes of works:
556.07 t – installation of reinforcement, including reinforcement folding and installation of special elements;
8118 m2 – grinding and treatment of floor surfaces;
2075.09 m2 – installation of thermal insulation;
2247.6 m2 – installation of water proofing;
1876.2 m3 – concreting.