PROJECT DESCRIPTION
Floor construction at the facility ““Gemoss”, Mūkusalas Street, Riga”
Main scope of work:
1100 m3 (concrete)
78 t (reinforcement)
Floor construction at the facility ““Gemoss”, Mūkusalas Street, Riga”
Main scope of work:
1100 m3 (concrete)
78 t (reinforcement)